Mississippi Canyon 243

Gulf of Mexico

OVERALL PROJECT SCOPE

The Mississippi Canyon 243 project consisted of a 10-inch gas export pipeline originating at a TLP in Mississippi Canyon 243 in 2810 fsw and terminating at a subsea tie-in MC 20 in 550 fsw. The export line consisted of a 10-inch SCR/pipeline approximately 16 miles in length and tied into an existing 20-inch pipeline. The tie in with the 20-inch tie-in required a hot-tap to be performed.

PCS SCOPE OF WORK

Project Consulting Services®, Inc. (PCS) was selected to provide services for permitting, project management, engineering support, and inspection. The following tasks were performed by PCS personnel:

  • Permitting Applications
  • Pipeline engineering and drafting services
  • Preparation of bid packages, evaluated and negotiated contracts for offshore construction activities
  • Review of contractors' installation procedures, welding procedures and third-party subcontractors
  • Project / construction management and engineering support
  • Project inspection

 

Natural Gas And Oil Prices

$96.02
$104.66
$4.06

Rig Counts

()Dec 69
()Dec 69
()Dec 69

Oil Futures Follow Broader Markets to One-Week High
May 16, 2013 - Oil futures rise to a one-week high, as broader markets rally on positive US economic data. ...read more

Transocean Shareholders Reject Icahn's Dividend Proposal
May 16, 2013 - Transocean shareholders reject a $4 a share dividend proposal by activist investor Carl Icahn but oust long-time company Chairman Michael Talbert. ...read more