West African Gas Pipeline

Nigeria, Benin, Togo, Ghana

OVERALL PROJECT SCOPE

This project consisted of the development of an onshore/offshore gas distribution network delivering gas from Nigeria to commercial customers in the neighboring countries of Benin, Togo, and Ghana. This project included the installation of a 57 km 30-inch onshore pipeline and onshore compression station in Nigeria, construction of a 579 km offshore pipeline distribution system, and installation of individual regulating and metering stations at each of the four gas receiving points in Cotonou (Benin), Lome (Togo), Tema (Ghana), and Takoradi (Ghana). The main offshore pipeline was an 20-inch pipe with smaller intermediate distribution spur pipelines sized between 8-inch and 18-inch. The lateral spur pipelines to each of the gas delivery points were tied into the main pipeline section by way of subsea tie-ins. Each landfall transition was horizontally drilled shore crossing.

PCS SCOPE OF WORK

Project Consulting Services®, Inc. (PCS) provided front-end engineering design and drafting services related to the offshore portion of the project. This included all pipelines, subsea tie-ins, and shore crossings. PCS also developed final route definition, managing and providing on-site inspection for all geophysical and geotechnical survey activities, reviewed project constructability issues, and developed detailed costs and schedules. Further, PCS developed risk assessment strategies, execution, contingency, testing and commissioning plans, assisted in all bid development and evaluation, coordinated all interface work between the onshore and offshore work, assisted in resolution of both HES issues and regulatory requirements, and provided input for EIA development.

img72_250

 

Natural Gas And Oil Prices

$48.24
$52.99
$2.69

Rig Counts

() 20
(394)January 202015
()

North Dakota: Crude Production is Being Focused in Four Core Counties
01-29-2015 - Oil prices will have to fall to near $30/barrel before production in North Dakota ceases, according to new analysis by the No ...read more

Development of APLNG Project is 88% Complete, First LNG Seen in Mid-2015
01-29-2015 - Origin Energy reports that Australia Pacific LNG project in Queensland, Australia is 88% complete, with first LNG scheduled f ...read more