Marsh Projects

CAMERON HIGHWAY OIL PIPELINE SYSTEM
Ship Shoal 332 to Texas City and Port Neches - GOM

OVERALL PROJECT SCOPE: Cameron Highway Oil Pipeline System (CHOPS) is a major new oil transportation system in the Gulf of Mexico with two major terminals located in southeast Texas. The 380-mile pipeline system delivers up to 500,000 barrels of oil per day from deepwater production sites in the southern Green Canyon and western Gulf of Mexico areas to onshore terminals in Texas City and Port Neches, Texas.

PCS SCOPE OF WORK: detailed cost estimates; Permitting and regulatory compliance; Project tracking and controls; Pipeline engineering, detailed design, and drafting; Prepared bid packages and evaluated and negotiated contracts for onshore and offshore construction activities; Provided project and construction management and engineering support.


read more

CREOLE TRAIL PIPELINE
OVERALL PROJECT SCOPE: 23 miles of 42-inch pipeline from the future site of Creole Trail LNG Facility to a proposed MLV near Carlyss, Louisiana.

PCS SCOPE OF WORK: PCS leads a project management team and is performing detail design including inspection of pipe coating, construction management and construction inspection.


read more

DISCOVERY PIPELINE SYSTEM
OVERALL SCOPE: The Discovery Pipeline System was designed and built to bring 600 MMCFD (expandable to over 1 BCFD) of natural gas and more than 7500 BPD of condensate from offshore fields in the Gulf of Mexico to a new gas processing plant in Larose, Louisiana.

PCS SCOPE OF WORK: PCS provided complete design engineering, permitting, inspection, construction management, materials sourcing, expediting and C.A.T.S.® (Construction Automated Tracking System) traceability services to the Discovery Partnership for this project. The full scope of work included all pipelines and pipeline conversions, launchers, risers, metering, instrumentation and corrosion protection for the pipeline system.


read more

GREEN LINE PIPELINE
OVERALL SCOPE: Green Line Pipeline is a CO2 pipeline that starts in Donaldsonville, Louisiana at the Choctaw Line and ends at the Hastings Field, south of Houston, Texas to be used as part of a tertiary CO2 flooding process. It consists of a 24-inch O.D. pipeline approximately 314 miles in length, transporting 800 MMSCFD of CO2

PCS SCOPE OF WORK: PCS is providing services for permitting, project management, and project engineering, CADD and purchasing. The following tasks are being performed by PCS personnel: Engineering FEL/detail; Bidding and award; Environmental permitting; Project controls/scheduling; Construction management; Inspection; Routing; Environmental issues; Commissioning.


read more



 

Natural Gas And Oil Prices

$96.02
$104.66
$4.06

Rig Counts

()Dec 69
()Dec 69
()Dec 69

Oil Futures Follow Broader Markets to One-Week High
May 16, 2013 - Oil futures rise to a one-week high, as broader markets rally on positive US economic data. ...read more

Transocean Shareholders Reject Icahn's Dividend Proposal
May 16, 2013 - Transocean shareholders reject a $4 a share dividend proposal by activist investor Carl Icahn but oust long-time company Chairman Michael Talbert. ...read more