Onshore Projects

Placeholder Image
DESTIN PIPELINE
PCS provided construction management oversight for the Destin Pipeline, which included design and construction of 117 miles of 36-inch, 17 miles of 30-inch, and two miles of 16-inch pipeline from Pascagoula, Mississippi to Central Mississippi.

read more

CAMERON HIGHWAY OIL PIPELINE SYSTEM
Ship Shoal 332 to Texas City and Port Neches - GOM
OVERALL PROJECT SCOPE: Cameron Highway Oil Pipeline System (CHOPS) is a major new oil transportation system in the Gulf of Mexico with two major terminals located in southeast Texas. The 380-mile pipeline system delivers up to 500,000 barrels of oil per day from deepwater production sites in the southern Green Canyon and western Gulf of Mexico areas to onshore terminals in Texas City and Port Neches, Texas.

PCS SCOPE OF WORK: PCS provided detailed cost estimates; Permitting and regulatory compliance; Project tracking and controls; Pipeline engineering, detailed design, and drafting; Prepared bid packages and evaluated and negotiated contracts for onshore and offshore construction activities; Provided project and construction management and engineering support.


read more

DISCOVERY PIPELINE SYSTEM
OVERALL SCOPE: The Discovery Pipeline System was designed and built to bring 600 MMCFD (expandable to over 1 BCFD) of natural gas and more than 7500 BPD of condensate from offshore fields in the Gulf of Mexico to a new gas processing plant in Larose, Louisiana.

PCS SCOPE OF WORK: PCS provided complete design engineering, permitting, inspection, construction management, materials sourcing, expediting and C.A.T.S.® (Construction Automated Tracking System) traceability services to the Discovery Partnership for this project. The full scope of work included all pipelines and pipeline conversions, launchers, risers, metering, instrumentation and corrosion protection for the pipeline system.


read more

GREEN LINE PIPELINE
OVERALL SCOPE: Green Line Pipeline is a CO2 pipeline that starts in Donaldsonville, Louisiana at the Choctaw Line and ends at the Hastings Field, south of Houston, Texas to be used as part of a tertiary CO2 flooding process. It consists of a 24-inch O.D. pipeline approximately 314 miles in length, transporting 800 MMSCFD of CO2

PCS SCOPE OF WORK: PCS is providing services for permitting, project management, and project engineering, CADD and purchasing. The following tasks are being performed by PCS personnel: Engineering FEL/detail; Bidding and award; Environmental permitting; Project controls/scheduling; Construction management; Inspection; Routing; Environmental issues; Commissioning.


read more

 

Natural Gas And Oil Prices

$96.16
$103.91
$4.19

Rig Counts

()Dec 69
()Dec 69
()Dec 69

Texas Sues Companies Connected to Macondo Oil Spill
May 20, 2013 - The state has accused companies involved with the oil spill of violating environmental laws and is seeking damages for lost revenue. ...read more

New US Energy Secretary Promises Review of Natural Gas Export Studies
May 20, 2013 - Ernest Moniz promises a review of the government's existing studies of nat gas exports, raising the possibility that the US might re-do the analysis that has underpinned previous permit approvals. ...read more