© Copyright 2011 Project Consulting Services. All rights reserved
PCS SCOPE OF WORK: PCS led a marine project management team with El Paso and performed the planning, engineering-including surveys, non-environmental permitting, procurement, contracting, and project management. PCS had the responsibility for the marine pipeline installation, platform design and installation, and interface with the land pipeline systems.
read more
OVERALL PROJECT SCOPE: Port Esperanza project is located more than 15 miles from the Port of Long Beach and about 10 miles from the closet point of land. This project will include floating re-gasification unit at the offshore facility. This system is securely anchored in 1100 feet of water.
PCS SCOPE OF WORK: PCS leads a project management team and is performing the planning, engineering-including surveys, permitting, procurement, contracting, and project management to ensure gas deliveries.
read more
PCS SCOPE OF WORK: PCS leads a project management team and is performing the planning, engineering-including surveys, permitting, procurement, contracting, and project management to ensure gas deliveries. PCS has the responsibility for the marine pipeline installation portions and the shore approach interface with the land pipeline systems. This responsibility includes the design of the pipe characteristics, the installation methods, and pipe requirements for bottom stability.
read more
Natural Gas And Oil Prices
$96.02
$104.66
$4.06
Rig Counts
()Dec 69
()Dec 69
()Dec 69
Oil Futures Follow Broader Markets to One-Week High
May 16, 2013 - Oil futures rise to a one-week high, as broader markets rally on positive US economic data. ...read more
Transocean Shareholders Reject Icahn's Dividend Proposal
May 16, 2013 - Transocean shareholders reject a $4 a share dividend proposal by activist investor Carl Icahn but oust long-time company Chairman Michael Talbert. ...read more

