OVERALL PROJECT SCOPE
The Mississippi Canyon 243 project consisted of a 10-inch gas export pipeline originating at a TLP in Mississippi Canyon 243 in 2810 fsw and terminating at a subsea tie-in MC 20 in 550 fsw. The export line consisted of a 10-inch SCR/pipeline approximately 16 miles in length and tied into an existing 20-inch pipeline. The tie in with the 20-inch tie-in required a hot-tap to be performed.
PCS SCOPE OF WORK
Project Consulting Services, Inc. (PCS) was selected to provide services for permitting, project management, engineering support, and inspection. The following tasks were performed by PCS personnel:
- Permitting Applications
- Pipeline engineering and drafting services
- Preparation of bid packages, evaluated and negotiated contracts for offshore construction activities
- Review of contractors' installation procedures, welding procedures and third-party subcontractors
- Project / construction management and engineering support
- Project inspection