OVERALL PROJECT SCOPE
After Hurricanes Katrina and Rita, PCS played a primary role in the repair efforts suffered by a major firm. PCS provided the following services:
- Engineering, Design and Drafting
- Developed all Drawings, for Permitting and AFC
- MMS Permitting Support
- Inspection Services
- Cost Tracking
- Project Tracking/Scheduling
- Assisted El Paso's Purchasing Department for material sourcing and expediting
- Preparation of bid packages, evaluated contracts for offshore construction activities
- Acted as liaison with third party contractors
- Project and Construction Management.
PCS PROJECT SCOPE
The Hurricane Repair Projects consisted of the following project scopes:
- Hot Tap Installations
- Interconnecting Piping Installations
- Pipelay
- Repair Clamps
- Riser Repairs
- Platform Structural Repairs
- Platform Pig Trap Repairs
- Reburial of Exposed Pipelines
- Inplace Pipeline Abandonments
- Pigging Procedures
- Pipeline Retrieval