PCS Project Portfolio

Midstream Onshore

Aegis Pipeline System

Aegis Pipeline System

270 Mile, 20”/16” Ethane Pipeline from Mont Belvieu, TX to Napoleonville, LA
 

View Details

ATEX Express Pipeline System

ATEX Express Pipeline System

Multiple Spread Support on 1,230 mile Pipeline from Utica Shale to Mt. Belvieu, including C.A.T.S. ® Traceability
 

View Details

BakkenLink Pipeline System

BakkenLink Pipeline System

132 Mile, 12" Williston Basin Crude to Rail Interconnect
 

View Details

Bartow Lateral

Bartow Lateral

Approximately 17.8 miles of 20-inch pipeline in Tampa Bay from a hot-tap on the existing 36-inch Gulfstream Line through an HDD shore approach to a pig receiver.
 

View Details

Baton Rouge Terminal Project

Baton Rouge Terminal Project

Concept development, engineering, project management, GIS & inspection to supply Import-Export facility.
 

View Details

Cameron Highway Oil Pipeline Onshore

Cameron Highway Oil Pipeline Onshore

51 miles of 24" Diameter Pipeline Segments from Offshore Production Sites to Texas City & Port Neches, Texas.
 

View Details

Creole Trail Pipeline & Sabine Pass LNG

Creole Trail Pipeline & Sabine Pass LNG

Expansion and reversal of natural gas system to LNG Export Facility.
 

View Details

Delhi Project Pipeline

Delhi Project Pipeline

78 miles of 24" pipeline and 3 miles of 16" pipeline with over 26 HDD's including crossings of the Mississippi and Yazoo Rivers.
 

View Details

Destin Pipeline

Destin Pipeline

117 miles of 36", 17 miles of 30", & 2 miles of 16" Pipeline
 

View Details

Eagle Ford South Crude Expansion

Eagle Ford South Crude Expansion

Comprehensive project management, design and inspection for 3 lateral crude oil pipelines and 7 central gathering points.
 

View Details

Green Pipeline

Green Pipeline

24" X-80 grade steel pipeline approximately 314 miles in length transporting approximately 800 MMscf / day of CO2.
 

View Details

Integrity Survey

Integrity Survey

Pipeline integrity survey program to inspect and evaluate approximately eighteen pipeline segments ranging in diameter from 16" to 30" and in lengths up to 90 miles.
 

View Details

Jackson Dome Laterals

Jackson Dome Laterals

Development of twelve pipeline laterals totaling 47.3 miles of 6" to 20" pipelines.
 

View Details

Lone Star West Texas Gateway

Lone Star West Texas Gateway

Project management support, engineering and design of pipeline and meter stations, project controls, bid preparation, and supplying PCS field project manager.
 

View Details

Port Arthur Terminal Pipelines

Port Arthur Terminal Pipelines

Co-laid products pipelines were installed from Refined Products Terminal to the Tank & Export Terminals.
 

View Details

Powder River Basin

Powder River Basin

Pipeline & facility construction to supply Pronghorn unit train loading facility, near Douglas Wyoming.
 

View Details

Power Plant Natural Gas Pipelines

Power Plant Natural Gas Pipelines

39 Miles of 16" and 24" natural gas pipelines in Mississippi and Alabama.
 

View Details

Seaway II Pipeline

Seaway II Pipeline

PCS supplied pipeline traceability and compliance services for 62,138 welds captured with C.A.T.S.® and document management for 242,280 documents with Epilogue®
 

View Details

Texas Express Pipeline

Texas Express Pipeline

Full traceability, project management and construction assurance on 593 mile, 20" intrastate pipeline.
 

View Details

Tiger Expansion Pipeline

Tiger Expansion Pipeline

20 miles of 42" Natural Gas Loop Lines in Bienville Parish, Louisiana.
 

View Details

Tiger Pipeline

Tiger Pipeline

180 miles of 42" X-70 Pipe & 21 Meter Stations
 

View Details

VCM Pipeline

VCM Pipeline

8" x 13.3 mile Pipeline System designed to transport Vinyl Chloride Monomer between Processing Plants.
 

View Details

West Texas LPG

West Texas LPG

Hydrotesting 149 miles pipe, Rebuilding 5 Pumping Stations, & Installation of 40 miles of new 12" pipe.
 

View Details

Whitson Pipeline and Compressor Station

Whitson Pipeline and Compressor Station

8 miles of 10" Pipeline to Transport Methane Gas to Interconnect
 

View Details

Offshore Projects

Cameron Highway Oil Pipeline

Cameron Highway Oil Pipeline

380 miles of 30" & 24" Diameter Pipeline Segments from Deepwater Production Sites to Texas City & Port Neches, Texas.
 

View Details

Gulfstream Natural Gas System

Gulfstream Natural Gas System

Marine portion of 744-mile system originates near Mobile, AL and crosses the Gulf of Mexico with more than 400 miles of 36-inch
 

View Details

Jay Field Pre-FEED Assessment

Jay Field Pre-FEED Assessment

Pre-Front End Engineering and Design Study & Due Diligence Assessment of Risks & Permitting Requirements.
 

View Details

Main Pass Block 252 to South Pass Block 55 - GOM

Main Pass Block 252 to South Pass Block 55 - GOM

94 miles of 20" pipe from Main Pass Block 252 to South Pass Block 55 and 6 miles of 16" pipe from Viosca Knoll Block 817.
 

View Details

Massachusetts Bay 30" Pipeline

Massachusetts Bay 30" Pipeline

30" diameter offshore pipeline approximately 29 miles in length constructed in the environmentally sensitive waters of Massachusetts Bay.
 

View Details

Mobile Bay Block 822 Flowlines & Utility Pipelines

Mobile Bay Block 822 Flowlines & Utility Pipelines

Production flowline and two utility pipelines that extended between a minimal wellhead facility in Mobile Bay Block 822 to a production facility.
 

View Details

Deepwater Projects

Allegheny Extension

Allegheny Extension

12" pipeline from steel catenary riser to a PLES (3,300 fsw), and 16" pipeline from PLES to a subsea tie-in (600 fsw)
 

View Details

Atlantis Deepwater Oil & Gas Platform

Atlantis Deepwater Oil & Gas Platform

Flow Line & Injection Line Construction on Deepest Moored Floating Dual Oil & Gas Production Facility
 

View Details

Discovery Pipeline System

Discovery Pipeline System

105 mile, 30-inch diameter mainline pipeline extending from the edge of the outer continental shelf from a platform at Ewing Bank Block 873 to the new plant site in Larose.
 

View Details

Green Canyon 209 Pipeline System

Green Canyon 209 Pipeline System

12" & 16" gas export pipeline originating at the 3,285 foot water depth in the Green Canyon Block 254 Allegheny field.
 

View Details

Medusa Downstream Gas Pipeline

Medusa Downstream Gas Pipeline

Construction and installation of a new truss SPAR at a water depth of 2,220' in Mississippi Canyon Block 582.
 

View Details

Mississippi Canyon 243 10" Gas Export Pipeline

Mississippi Canyon 243 10" Gas Export Pipeline

TLP in Mississippi Canyon 243 in 2810' and terminating at a subsea tie-in MC 20 in 550'.
 

View Details

Prince Export Pipelines

Prince Export Pipelines

Modec Tension Leg Platform (TLP), four in-field flowlines, one gas export Steel Catenary Riser (SCR)/pipeline and one oil export SCR/pipeline.
 

View Details

Specialty Projects

Blue Atlantic Transmission System - Study

Blue Atlantic Transmission System - Study

Proposed 1,000 miles of new offshore & onshore pipelines, four platforms, gas processing & compression station.
 

View Details

Esperanza LNG - Study

Esperanza LNG - Study

Floating LNG re-gasification unit at the offshore facility, 15 miles from the Port of Long Beach.
 

View Details

Gulf Coast Natural Gas Pipeline Pre-FEED

Gulf Coast Natural Gas Pipeline Pre-FEED

348 Miles of 36" diameter, X-70 pipeline transporting natural gas to supply the growing Florida market
 

View Details

Port Arthur Terminal Pipelines

Port Arthur Terminal Pipelines

Co-laid products pipelines were installed from Refined Products Terminal to the Tank & Export Terminals.
 

View Details

Texas Offshore Port System (TOPS)

Texas Offshore Port System (TOPS)

Crude oil delivery port was envisioned offshore the Texas coastline.
 

View Details

VCM Pipeline

VCM Pipeline

8" x 13.3 mile Pipeline System designed to transport Vinyl Chloride Monomer between Processing Plants.
 

View Details

Global Projects

Prince Rupert Gas Transmission

Prince Rupert Gas Transmission

Pre-FEED, FEED, bid management and project leadership in preparation for the proposed onshore and offshore Canadian pipeline.
 

View Details

West African Gas Pipeline

West African Gas Pipeline

Installation of a 57 km 30-inch onshore pipeline and onshore compression station in Nigeria, construction of a 579 km offshore pipeline distribution system
 

View Details